Short Lead Time for Check Valve With Nbr Seat - A216 WCB 900LBS Check Valve CVC-00900-6 – Deye

Short Lead Time for Check Valve With Nbr Seat - A216 WCB 900LBS Check Valve CVC-00900-6 – Deye

Short Description:


Feature

Product Tags

Related Video

Feedback (2)

We have now probably the most innovative production equipment, experienced and qualified engineers and workers, regarded high quality control systems and also a friendly expert income team pre/after-sales support for Ductile iron ball valve , 150LBS/300LBS Butterfly Valve , Brass seat check valve , All prices depend upon the quantity of your order; the more you order, the more economical the price is. We also offer good OEM service to many famous brands.
Short Lead Time for Check Valve With Nbr Seat - A216 WCB 900LBS Check Valve CVC-00900-6 – Deye Detail:

Quick Detail

Design standard: API 600.API594 BS1868

Body material: WCB. Carbon Steel

Nominal diameter: 6”DN150

Pressure: CL900LBS

End connection: RF. Flange

Face to face: ASME B16.10.

Working temperature: -29~+425.

Test and inspection: API 598.

Full bore Check valves

High Pin Flat Disc Check Valves

Integral Disc check valves

 

On Request

Available Material: A216WCB/WCC/LCB/WC9/C5/CF8M/CF3

Optional Stem: A182F6a, A182F304, A182F316, F51/F53

Optional Seat & Trim: STL, 2CR13, SS304, SS316/F51

Optional End connection:

Range of valve sizes diameter: 1/2″~60″ (DN15~DN1500).

Range of pressure: 150lbs~2500lbs (PN16~PN420).

Optional: By pass design

Optional Operation: automatic type or Lever and counter weight

 

Performance:

INSPECTION BEFORE INSTALLATION

  1. Before installation, check the valve name plate and valve body information to ensure the valve is suitable for the intended service.
  2. Before installation, remove the flange cover and the protective film on the flange sealing face, and disc support, inspect the bore and the flange sealing surface, remove any dirt with clean soft cloth, use an anti-corrosive cleaning liquid to clean if necessary, and never use any other chemical products.
  3.  Inspect the flange gasket (including ring gasket) sealing surface and ensure it is in acceptable condition for installation. Install Position the valve into the pipe or the flange connection; ensure that any stress caused by improper pipe alignment is relieved first. Valves are not intended to be a means of aligning improperly fitted pipe.2 Valves marked with flow direction must be installed in line with the piping flow.3 Valve should be installed in a horizontal position with the center of the valve.

     

Application:

The medium is water, steam, gas, corrosive medium, oil, medicine, etc.


Product detail pictures:

Short Lead Time for Check Valve With Nbr Seat -
  A216 WCB 900LBS Check Valve CVC-00900-6 – Deye detail pictures


Related Product Guide:

We have been also concentrating on enhancing the things management and QC method so that we could preserve terrific edge inside the fiercely-competitive enterprise for Short Lead Time for Check Valve With Nbr Seat - A216 WCB 900LBS Check Valve CVC-00900-6 – Deye , The product will supply to all over the world, such as: Mumbai , Grenada , Swiss , You can let us know your idea to develop unique design for your own model to prevent too much similar parts in the market! We will provide our best service to satisfy all your needs! You should contact us right away!
  • The after-sale warranty service is timely and thoughtful, encounter problems can be resolved very quickly, we feel reliable and secure.
    5 Stars By Moira from Florida - 2018.06.19 10:42
    Good quality and fast delivery, it's very nice. Some products have a little bit problem, but the supplier replaced timely, overall, we are satisfied.
    5 Stars By Sarah from Eindhoven - 2018.06.09 12:42
    Write your message here and send it to us