Original Factory End Entry Ball Valve - WCB API600 CLASS300 Gate Valve GVC-00300 – Deye

Original Factory End Entry Ball Valve - WCB API600 CLASS300 Gate Valve GVC-00300 – Deye

Short Description:


Feature

Product Tags

Related Video

Feedback (2)

We insist on the principle of development of 'High quality, Efficiency, Sincerity and Down-to-earth working approach' to provide you with excellent service of processing for Single Disc check valve , Fire Fighting Butterfly Valve , A536 gate valve , We welcome an prospect to do enterprise along with you and hope to have pleasure in attaching even more aspects of our items.
Original Factory End Entry Ball Valve - WCB API600 CLASS300 Gate Valve GVC-00300 – Deye Detail:

Quick Detail

Design standard: ANSI B16.34

Body material: WCB.

Nominal diameter: 12”

Pressure: CL300LBS

End connection: RF FLANGE

Face to face: ASME B16.10.

BB OS& Y Design valve

Bi-Direction Gate Valve

Working temperature: -29~+425.

Mode of operation: handwheel

Test and inspection: API 598.

Body test pressure: 7.5Mpa

Seat Test Pressure: 5.5Mpa.

 

Products Range:

Available Material: Cast steel. A216WCB, WCC, LCB, LCC, SS.

Optional stem/shaft: A182F6a, SS304, SS316, SAF2507 SAF2205

Optional seal/Seat:  STL, 2CR13, SS304, SS316 SDSS

Optional End connection: butt welding, RF, NPT, SW

Optional Operation:  Gearbox, Electric, Pneumatic actuator

Range of the size diameter: 1/2″~60″ (DN15~DN1500).

Range of the Rating: 150lbs~2500lbs (PN16~PN420).

Customized Design is negotiable.

 

Performance:

 Operation & Assembly

- Vertical orientation requirement of valves during operation, testing, and installation is prescribed to all gate valves.

 - All gate valve operators must be assembled in the upright position vertically above the valve’s centerline.

  1.  Gearboxes, actuators and necessary adapters must conform to the valve’s ISO pad top works design
  2.  Adapter plates and gears must be bolted to the valve top works plate using the correct bolt size, torque, and tightening pattern.
  3. The stem must be protected at all times from unnecessary movement, stress, force or other potential damage while ensuring the stem remains centered in the yoke tube during installation
  4. Automation mechanisms must be designed, assembled, and supported in a manner as to not exert
  5. uneven or unbalanced forces on the valve assembly that could contribute to a side load condition.

Product detail pictures:

Original Factory End Entry Ball Valve -
 WCB  API600  CLASS300  Gate Valve  GVC-00300 – Deye detail pictures


Related Product Guide:

We goal to see good quality disfigurement within the manufacturing and provide the most effective support to domestic and overseas shoppers wholeheartedly for Original Factory End Entry Ball Valve - WCB API600 CLASS300 Gate Valve GVC-00300 – Deye , The product will supply to all over the world, such as: Albania , Bahrain , kazan , With the growing of the company, now our products sold and served at more than 15 countries around the world,such as Europe,North America,Middle-east,South America,Southern Asia and so on. As we bear in our mind that innovation is essential to our growth, new product development is constantly.Besides, Our flexible and efficient operation strategies,High quality products and competitive prices are exactly what our customers are looking for. Also a considerable service brings us good credit reputation.
  • This supplier stick to the principle of "Quality first, Honesty as base", it is absolutely to be trust.
    5 Stars By Melissa from Anguilla - 2018.06.05 13:10
    It is really lucky to meet such a good supplier, this is our most satisfied cooperation, I think we will work again!
    5 Stars By Lee from Greenland - 2018.09.21 11:44
    Write your message here and send it to us