Original Factory End Entry Ball Valve - A216 WCB 900LBS Check Valve CVC-00900-6 – Deye

Original Factory End Entry Ball Valve - A216 WCB 900LBS Check Valve CVC-00900-6 – Deye

Short Description:


Feature

Product Tags

Related Video

Feedback (2)

As a way to present you with ease and enlarge our enterprise, we also have inspectors in QC Workforce and assure you our greatest support and solution for Soft seal plug valve , Gate valve for sea water , A105N check Valve , We welcome new and old customers from all walks of life to contact us for future business relationships and mutual success.
Original Factory End Entry Ball Valve - A216 WCB 900LBS Check Valve CVC-00900-6 – Deye Detail:

Quick Detail

Design standard: API 600.API594 BS1868

Body material: WCB. Carbon Steel

Nominal diameter: 6”DN150

Pressure: CL900LBS

End connection: RF. Flange

Face to face: ASME B16.10.

Working temperature: -29~+425.

Test and inspection: API 598.

Full bore Check valves

High Pin Flat Disc Check Valves

Integral Disc check valves

 

On Request

Available Material: A216WCB/WCC/LCB/WC9/C5/CF8M/CF3

Optional Stem: A182F6a, A182F304, A182F316, F51/F53

Optional Seat & Trim: STL, 2CR13, SS304, SS316/F51

Optional End connection:

Range of valve sizes diameter: 1/2″~60″ (DN15~DN1500).

Range of pressure: 150lbs~2500lbs (PN16~PN420).

Optional: By pass design

Optional Operation: automatic type or Lever and counter weight

 

Performance:

INSPECTION BEFORE INSTALLATION

  1. Before installation, check the valve name plate and valve body information to ensure the valve is suitable for the intended service.
  2. Before installation, remove the flange cover and the protective film on the flange sealing face, and disc support, inspect the bore and the flange sealing surface, remove any dirt with clean soft cloth, use an anti-corrosive cleaning liquid to clean if necessary, and never use any other chemical products.
  3.  Inspect the flange gasket (including ring gasket) sealing surface and ensure it is in acceptable condition for installation. Install Position the valve into the pipe or the flange connection; ensure that any stress caused by improper pipe alignment is relieved first. Valves are not intended to be a means of aligning improperly fitted pipe.2 Valves marked with flow direction must be installed in line with the piping flow.3 Valve should be installed in a horizontal position with the center of the valve.

     

Application:

The medium is water, steam, gas, corrosive medium, oil, medicine, etc.


Product detail pictures:

Original Factory End Entry Ball Valve -
  A216 WCB 900LBS Check Valve CVC-00900-6 – Deye detail pictures


Related Product Guide:

we can offer high quality products, competitive price and best customer service. Our destination is "You come here with difficulty and we give you a smile to take away" for Original Factory End Entry Ball Valve - A216 WCB 900LBS Check Valve CVC-00900-6 – Deye , The product will supply to all over the world, such as: Roman , London , America , Why we can do these? Because: A, We are honest and reliable. Our items have high quality, attractive price, sufficient supply capacity and perfect service. B, Our geographical position has a big advantage . C, Various types: Welcome your inquiry, It might be highly appreciated.
  • The sales manager has a good English level and skilled professional knowledge, we have a good communication. He is a warm and cheerful man, we have a pleasant cooperation and we became very good friends in private.
    5 Stars By Ray from Greek - 2017.02.18 15:54
    With a positive attitude of "regard the market, regard the custom, regard the science", the company works actively to do research and development. Hope we have a future business relationships and achieving mutual success.
    5 Stars By Cornelia from Bangkok - 2018.06.03 10:17
    Write your message here and send it to us